Name of the project: Energy renewal and renewable energy sources in cement factory NEXE d.d. –EnU-2 (K.K:04.11.02.0291)
Public invitation: increase of energy efficiency and use of renewable energy sources in production industries , K.K. 04.11.03 – version 3, operative program competitiveness and cohesion 2014-2020
Short project description:
The project comprises implementation of measures of energy efficiency and renewable energy sources in production plant and energy renewal of buildings aimed at increasing efficiency of energy use and reduction of share of conventional sources by introducing renewable energy sources in cement factory NEXE d.d. in Našice. Measures that will be implemented in production plant and in buildings include: introduction of more effective electric drives, implementation of technological and other measures and activities in production/work process which result in decrease of energy consumption and contribute to energy efficiency of the process; revitalization of electric installations –effective lightning systems; installation of smart meters and devices for detailed follow-up of energy consumption, installation of new systems for production of electric energy from solar energy; heat insulation of external opaque parts of the building envelope (roof, external wall, from floor to soil, buried parts of the envelope, floors toward external space, floors, ceilings and walls toward unheated space; replacement or renewal of external carpentry, replacement or renewal of light openings); improvement of existing or installation of more effective building ventilation systems, installation of new systems for production of heat and/or cooling energy, energy for heating sanitary and/or technological water and energy for heating and cooling of space with heat pumps with water as heating and cooling medium in secondary circle.
Total project value: 24.942.402,11 HRK
Amount of awarded non-refundable funds: 9.892.211,18 HRK
Project implementation period: 09/06/2020 – 30/06/2023
Contact person:
Matija Koš, project manager
e-mail: [email protected]
Project was co-financed by European Union from European fund for regional development.